Safety equipment for the entry BETA in Dortmund
Supply of electrotechnical, hydraulic and pneumatic equipment
Customer: thyssenkrupp Steel Europe AG
Year: 2016-2018
- Project Description
Creation of safety technology for the inlet of the pickle
The safety technology was implemented in the existing system
- Year of Construction
2016-2018
- Customer
thyssenkrupp Steel AG
- Hardware
S7-400 bestehend aus:
CPU417-4H, CP443-1, CP443-5, DP-Peripherie ET200S
- Drive Technology
vorhanden bestehend aus Siemens TDC
- HMI
existing, consisting of
1 x Doppelserversystem, 4 x ES, 25 Clients, 1 x WebServer
- Software
PCS V7.1, SFC, D7-Sys, PDM, S7 F Systems, Starter, Drive ES
- Service
- Engineering
- Configuration of the hardware plans with Eplan
- Programming the controller and safety functions with PCS7
- Creation of the visualization
- Validation of the safety functions
- Commissioning
- Fabrication
Construction of the control cabinets
Construction of the control-sections
- Assembling
Complete electrical installations
expansion of the cable runs, assembling of the control cabinets, disassembly